Roof beam goes up!

As you can probably tell, the logistics of getting this beam into place were not trivial. A crane was used to get the beam onto the 2nd floor. Then, Genie lifts (see right side of photos), which were also hoisted by crane onto the site, were used to put the beam in place. This steel beam is needed because the doors underneath will be all glass.