Saturday, March 24, 2012

Painting Progress

1st floor painting is complete.

                                            Headboard wall of MBR
Bunk Bed room, with ladder. Should we have painted the back wall dark, and the bed white?


2nd floor more than half complete:



   Shades may be required to sit in this office - either on my head or on the windows.

These two photos are of the 2nd floor powder room between the offices and the staircase.



These last two photos represent primer coats only. The media monolith will ultimately be painted dark brown. In the last photo, for the 1st time, you can see the cabinets (wrapped) that divide the spaces of our 2nd floor great room .

No comments:

Post a Comment